Availability and failure

Q1. The catalog service fails on average every 500 hours and takes 30 minutes to recover. What is its availability?

  • A. 99%
  • B. 99.5%
  • C. 99.9%
  • D. 99.99%
Answer

C β€” 99.9%.

Availability = MTTF / (MTTF + MTTR) = 500 / 500.5 β‰ˆ 0.999. Notice the lever: cutting MTTR to 3 minutes (automatic restart) would give 500 / 500.05 β‰ˆ 99.99% without changing how often it fails.


Q2. The product team asks for 99.99% monthly availability on the purchase path. What does that imply operationally?

  • A. Nothing special: it is only 0.09% better than 99.9%
  • B. About 4.4 minutes of downtime per month β€” less than it takes to page someone and roll back by hand, so detection and recovery must be automated
  • C. About 43 minutes per month, enough for one manual rollback
  • D. Zero downtime: deploys must be done at night
Answer

B β€” about 4.4 minutes per month; automation is mandatory.

Each nine is 10Γ— less downtime: 99.9% allows β‰ˆ 43.8 min per month, 99.99% β‰ˆ 4.38 min. A human response (alert, wake up, diagnose, roll back) does not fit in that budget, so failover, rollback and health-based routing must be automatic β€” and synchronous dependencies at 99.9% (like a payment provider) make the target impossible without redundancy.


Q3. The gateway runs 3 independent replicas at 99% each, and every request also needs a database at 99.95%. What is the approximate availability of the path?

  • A. 97%
  • B. 99%
  • C. 99.95%
  • D. 99.9999%
Answer

C β€” about 99.95%.

The replicas are in parallel: \(1 - 0.01^3 = 99.9999\%\). The database is in series: \(0.999999 \times 0.9995 \approx 99.95\%\). Once a component is replicated, the non-replicated components dominate; the next improvement must target the database (e.g. a standby with automatic failover).


Q4. order receives 50 requests/s that call payment, and has a pool of 100 threads. Payment latency goes from 100 ms to 5 s and there is no timeout. What happens?

  • A. Nothing: 50 requests/s is well below 100 threads
  • B. About 250 calls would be in flight (50 Γ— 5), more than the pool: order exhausts its threads and its other routes start failing too
  • C. 25 threads are used, so 75 remain free
  • D. Payment calls fail fast with an error
Answer

B β€” thread exhaustion and a cascade.

Little's Law: calls in flight = arrival rate Γ— time per call. At 100 ms, 5 threads are busy; at 5 s, 250 would be β€” beyond the pool of 100. Requests queue, every route of order slows down (including routes that do not call payment), and callers of order start to exhaust their own pools. A timeout, a circuit breaker and a bulkhead each break this chain.


SLIs, SLOs and error budgets

Q5. Which of these is the best SLI for the seat-hold journey?

  • A. Average CPU usage of the inventory pods
  • B. Number of inventory pods running
  • C. Proportion of POST /holds requests, measured at the gateway, that return non-5xx in under 500 ms
  • D. Average latency of POST /holds over the day
Answer

C β€” a ratio of good events to valid events, measured near the user.

CPU and pod count are infrastructure metrics: a service can be at low CPU and fully broken. An average hides the tail (5% of fans waiting 4 s barely moves it). A good SLI says what fraction of user requests were good β€” fast enough and successful β€” and can be compared with a target.


Q6. The purchase path serves 2,000,000 requests per day with an SLO of 99.95% over 28 days. How many failed requests does the error budget allow in the window?

  • A. 1,000
  • B. 28,000
  • C. 56,000
  • D. 2,800
Answer

B β€” 28,000.

Requests in the window: \(2\,000\,000 \times 28 = 56\,000\,000\). Budget: \((1 - 0.9995) \times 56\,000\,000 = 0.0005 \times 56\,000\,000 = 28\,000\) failed requests.


Q7. With an SLO of 99.9% over 28 days, the error rate is steady at 0.6%. What is the burn rate, and when is the budget exhausted?

  • A. 0.6Γ—; never
  • B. 6Γ—; in about 4.7 days
  • C. 60Γ—; in about 11 hours
  • D. 6Γ—; in 6 hours
Answer

B β€” 6Γ—, about 4.7 days.

Burn rate = error rate / (1 βˆ’ SLO) = 0.006 / 0.001 = 6. The budget lasts the window divided by the burn rate: 28 / 6 β‰ˆ 4.7 days. In the SRE Workbook's scheme, a 6Γ— burn sustained over 6 hours (5% of the budget) is a paging alert.


Resilience patterns

Q8. The gateway, order and the payment adapter each retry failed calls, with up to 3 attempts per layer. The provider is down. How many calls can one fan click generate to the provider?

  • A. 3
  • B. 9
  • C. 27
  • D. 81
Answer

C β€” 27.

Attempts multiply across layers: \(3 \times 3 \times 3 = 27\). Retries at every layer turn an outage into a storm exactly when the dependency is weakest. Retry at one layer (close to the dependency), cap attempts, use backoff with jitter and a retry budget, and let the circuit breaker stop retries when the dependency is known to be down.


Q9. After a database failover, 1,000 clients get a connection error at the same instant and all retry with exponential backoff (0.5 s, 1 s, 2 s…) without jitter. What goes wrong, and what is the fix?

  • A. Nothing: exponential backoff already spreads the retries
  • B. All clients retry at the same instants, creating synchronized spikes above capacity; most fail again. Full jitter randomizes each wait so retries spread out
  • C. The retries are too slow; retry immediately instead
  • D. The database must be scaled to handle 1,000 concurrent connections
Answer

B β€” synchronized waves; add full jitter.

Backoff without jitter keeps clients that failed together in lockstep: 1,000 requests at 0.5 s, the survivors at 1.5 s, and so on, each wave above capacity. Full jitter (\(\text{random}(0, \text{base} \cdot 2^n)\)) spreads them so most succeed in the first round.


Q10. The payment circuit breaker opens several times a day although the provider is healthy. Investigation shows that waves of declined cards (bots testing stolen cards) are counted as failures. What should be changed?

  • A. Raise the failure threshold to 95%
  • B. Remove the circuit breaker
  • C. Configure business errors such as "card declined" as ignored exceptions, so only technical failures (errors, timeouts, slow calls) count
  • D. Retry declined cards three times
Answer

C β€” do not count correct business answers as failures.

A declined card is a valid response from a healthy provider. Counting it opens the breaker for every honest fan. Retrying it (D) is never right: the answer is final. Breakers should count technical failures β€” and slow calls, to catch gray failures.


Q11. At peak, order makes 100 payment calls per second with a normal latency of 200 ms. The team sets a payment bulkhead of 50 concurrent calls. What does that give?

  • A. Payment calls are limited to 50 per second
  • B. About 20 calls are normally in flight; the bulkhead tolerates latency growing about 2.5Γ— before rejecting, and when payment is very slow at most 50 threads wait on it, leaving the rest for other routes
  • C. 50 threads are reserved and always busy
  • D. Payment calls will be retried 50 times
Answer

B β€” headroom of about 2.5Γ— and a cap on the damage.

Little's Law: \(100 \times 0.2 = 20\) concurrent calls normally. With 50 permits, latency can reach about 500 ms before calls are rejected. If payment goes to 4 s, at most 50 threads wait (instead of 400), and calls beyond that fail immediately into the fallback while seat holds and the catalog keep working.


Q12. A team adds a database check to the liveness probe of order. The database has a 20-second blip. What happens?

  • A. Nothing: Kubernetes ignores probes shorter than a minute
  • B. Every order replica fails liveness at the same time and is restarted; a 20-second database blip becomes a multi-minute outage while all JVMs boot
  • C. Only the replica that noticed the blip is restarted
  • D. The replicas are removed from the load balancer and added back when the database returns
Answer

B β€” a fleet-wide restart.

Liveness failure means "restart the container". A shared dependency in liveness makes all replicas fail together. Liveness should only detect a stuck process; readiness removes an instance from the load balancer (D describes readiness) β€” and even readiness must be used carefully with shared dependencies.


Disaster recovery and chaos

Q13. At 22:00 a script deletes every row of orders in production. The synchronous standby in another zone replicated the delete. What restores the data, and which objective does the restore time affect?

  • A. Promote the standby; it affects the RPO
  • B. A point-in-time restore from backups (base backup + WAL replay up to 21:59:59); the restore duration determines the RTO, the archiving delay the RPO
  • C. Nothing can restore it: replication is the backup
  • D. Fail over to another region; it affects the RPO
Answer

B β€” PITR from backups.

Replicas (in-zone or cross-region) copy the mistake. Recovering from a logical failure needs a copy from before it: a base backup plus archived WAL replayed to the instant before the delete. RPO is bounded by how often WAL is archived; RTO by how long the restore takes β€” which must be measured (2 TB at 200 MB/s is almost 3 hours).


Q14. For the BoxOffice purchase path the business asks for RTO ≀ 15 minutes and RPO of seconds in case of a regional outage, at a reasonable cost. Seats must never be sold twice. Which strategy fits best?

  • A. Backup and restore in another region
  • B. Pilot light with services scaled to zero
  • C. Warm standby: databases replicated asynchronously to a second region, a scaled-down copy of the services running there, promoted and scaled up on failover (with fencing of the old primary)
  • D. Multi-site active-active with both regions accepting seat holds and replicating to each other
Answer

C β€” warm standby.

Backup and restore (A) takes hours; pilot light (B) needs services started and scaled from zero, which is hard to fit in 15 minutes reliably. Active-active with writes in both regions (D) risks double-selling a seat unless a globally consistent database or a home region per event is used β€” at a much higher cost. A warm standby meets RPO (replication lag of seconds) and RTO (detect + decide + promote + scale + DNS TTL), provided it is rehearsed in DR drills.


Q15. The team wants to verify that the payment circuit breaker really protects the catalog. Which plan is a proper chaos experiment?

  • A. Kill random production pods during the next stadium on-sale and see what happens
  • B. State the steady state (catalog p99 < 300 ms, purchase success β‰₯ 99.9%) and the hypothesis (with 3 s of provider latency the breaker opens within 30 s and catalog latency stays flat); inject the latency with Toxiproxy under k6 load, first in staging, with an abort condition on the burn rate
  • C. Write a unit test that mocks the breaker as open
  • D. Wait for the next real provider incident and read the postmortem
Answer

B β€” hypothesis, controlled injection, small blast radius, abort condition.

Chaos engineering is an experiment: predict the steady state, inject one realistic fault, observe the SLIs, compare. A (random failures during an on-sale, no hypothesis, no abort) is reckless; C does not exercise timeouts, pools and real traffic; D is waiting for production to run the experiment for you, at the worst moment.